Skip to content

Images

Ashby museum has an archive of over 3000 photographs – both original and copies. This page allows people to view the main group of photographs, but does not include photographs in specialist collections as these often include ones that are not in our primary area of interest. Larger images may be viewed at the museum during opening hours, and copies for private use may be purchased.

This page also allows access to details of artefacts (physical objects) held by the museum. Please note that when changing between photographs and artefacts, the classification list is only updated after the first search.

Select archive type
Filter by classification and/or text

Showing images 661 to 670 of 4081
AYZMU:P15-0080 image 15 of 23
1960 - 1969
Standard Soap -factory interior and exterior views. Mostly the 1960's. soap127 Glycerin building and the reservoirs of the old waterworks (almost identical to soap05 but more blurred) soap128 Large building housing the flake mill. Small building in front is the perfume store soap129 Fat Plant inside the vaulted roof building shown in soap 13 soap130 Ladies' locker room before 1962. It later became the factory shop soap131 "Car park in the 1980s with ""Castle Works"" wrought iron gate to right" soap132 Same mill room as in soap08 but post 1964 when the production lines were turned round soap133 New MM automatic stamper line 5. This room was next to the one in soap132 soap134 Line 5 again (as in soap133) with an experimental base feeder going up to the mixer soap135 Four story factory and part of Glycerin building in about 1963 soap136 The old fitting shop soap137 The old fitting shop with a view through the window to the new mill room completed in about 1964 soap138 Fitting shop stores and offices soap139 "The White House, used as an office block. To the right can be seen the MD's garage and to the left the new mill room. Date, after 1964" soap140 The White House office block with Compton Building behind soap141 Number 7 plodder and cutter in operation soap142 The MM Stamper soap143 Production line with perspex cover leading to GD Wrapping Machine soap144 The control panel for the plodder soap145 Cooling fan to stop the diodes in the control panel from burning out soap146 The back of the MM stamper feeding soap to the GD Wrapping machine soap147 "The original Compton Building under construction, completed 22nd May 1964" soap148 Interior of the unfinished Compton building soap149 The finishing touches being put to the Compton building

AYZMU:P15-0080 image 16 of 23
1960 - 1969
Standard Soap -factory interior and exterior views. Mostly the 1960's. soap127 Glycerin building and the reservoirs of the old waterworks (almost identical to soap05 but more blurred) soap128 Large building housing the flake mill. Small building in front is the perfume store soap129 Fat Plant inside the vaulted roof building shown in soap 13 soap130 Ladies' locker room before 1962. It later became the factory shop soap131 "Car park in the 1980s with ""Castle Works"" wrought iron gate to right" soap132 Same mill room as in soap08 but post 1964 when the production lines were turned round soap133 New MM automatic stamper line 5. This room was next to the one in soap132 soap134 Line 5 again (as in soap133) with an experimental base feeder going up to the mixer soap135 Four story factory and part of Glycerin building in about 1963 soap136 The old fitting shop soap137 The old fitting shop with a view through the window to the new mill room completed in about 1964 soap138 Fitting shop stores and offices soap139 "The White House, used as an office block. To the right can be seen the MD's garage and to the left the new mill room. Date, after 1964" soap140 The White House office block with Compton Building behind soap141 Number 7 plodder and cutter in operation soap142 The MM Stamper soap143 Production line with perspex cover leading to GD Wrapping Machine soap144 The control panel for the plodder soap145 Cooling fan to stop the diodes in the control panel from burning out soap146 The back of the MM stamper feeding soap to the GD Wrapping machine soap147 "The original Compton Building under construction, completed 22nd May 1964" soap148 Interior of the unfinished Compton building soap149 The finishing touches being put to the Compton building

AYZMU:P15-0080 image 17 of 23
1960 - 1969
Standard Soap -factory interior and exterior views. Mostly the 1960's. soap127 Glycerin building and the reservoirs of the old waterworks (almost identical to soap05 but more blurred) soap128 Large building housing the flake mill. Small building in front is the perfume store soap129 Fat Plant inside the vaulted roof building shown in soap 13 soap130 Ladies' locker room before 1962. It later became the factory shop soap131 "Car park in the 1980s with ""Castle Works"" wrought iron gate to right" soap132 Same mill room as in soap08 but post 1964 when the production lines were turned round soap133 New MM automatic stamper line 5. This room was next to the one in soap132 soap134 Line 5 again (as in soap133) with an experimental base feeder going up to the mixer soap135 Four story factory and part of Glycerin building in about 1963 soap136 The old fitting shop soap137 The old fitting shop with a view through the window to the new mill room completed in about 1964 soap138 Fitting shop stores and offices soap139 "The White House, used as an office block. To the right can be seen the MD's garage and to the left the new mill room. Date, after 1964" soap140 The White House office block with Compton Building behind soap141 Number 7 plodder and cutter in operation soap142 The MM Stamper soap143 Production line with perspex cover leading to GD Wrapping Machine soap144 The control panel for the plodder soap145 Cooling fan to stop the diodes in the control panel from burning out soap146 The back of the MM stamper feeding soap to the GD Wrapping machine soap147 "The original Compton Building under construction, completed 22nd May 1964" soap148 Interior of the unfinished Compton building soap149 The finishing touches being put to the Compton building

AYZMU:P15-0080 image 18 of 23
1960 - 1969
Standard Soap -factory interior and exterior views. Mostly the 1960's. soap127 Glycerin building and the reservoirs of the old waterworks (almost identical to soap05 but more blurred) soap128 Large building housing the flake mill. Small building in front is the perfume store soap129 Fat Plant inside the vaulted roof building shown in soap 13 soap130 Ladies' locker room before 1962. It later became the factory shop soap131 "Car park in the 1980s with ""Castle Works"" wrought iron gate to right" soap132 Same mill room as in soap08 but post 1964 when the production lines were turned round soap133 New MM automatic stamper line 5. This room was next to the one in soap132 soap134 Line 5 again (as in soap133) with an experimental base feeder going up to the mixer soap135 Four story factory and part of Glycerin building in about 1963 soap136 The old fitting shop soap137 The old fitting shop with a view through the window to the new mill room completed in about 1964 soap138 Fitting shop stores and offices soap139 "The White House, used as an office block. To the right can be seen the MD's garage and to the left the new mill room. Date, after 1964" soap140 The White House office block with Compton Building behind soap141 Number 7 plodder and cutter in operation soap142 The MM Stamper soap143 Production line with perspex cover leading to GD Wrapping Machine soap144 The control panel for the plodder soap145 Cooling fan to stop the diodes in the control panel from burning out soap146 The back of the MM stamper feeding soap to the GD Wrapping machine soap147 "The original Compton Building under construction, completed 22nd May 1964" soap148 Interior of the unfinished Compton building soap149 The finishing touches being put to the Compton building

AYZMU:P15-0080 image 19 of 23
1960 - 1969
Standard Soap -factory interior and exterior views. Mostly the 1960's. soap127 Glycerin building and the reservoirs of the old waterworks (almost identical to soap05 but more blurred) soap128 Large building housing the flake mill. Small building in front is the perfume store soap129 Fat Plant inside the vaulted roof building shown in soap 13 soap130 Ladies' locker room before 1962. It later became the factory shop soap131 "Car park in the 1980s with ""Castle Works"" wrought iron gate to right" soap132 Same mill room as in soap08 but post 1964 when the production lines were turned round soap133 New MM automatic stamper line 5. This room was next to the one in soap132 soap134 Line 5 again (as in soap133) with an experimental base feeder going up to the mixer soap135 Four story factory and part of Glycerin building in about 1963 soap136 The old fitting shop soap137 The old fitting shop with a view through the window to the new mill room completed in about 1964 soap138 Fitting shop stores and offices soap139 "The White House, used as an office block. To the right can be seen the MD's garage and to the left the new mill room. Date, after 1964" soap140 The White House office block with Compton Building behind soap141 Number 7 plodder and cutter in operation soap142 The MM Stamper soap143 Production line with perspex cover leading to GD Wrapping Machine soap144 The control panel for the plodder soap145 Cooling fan to stop the diodes in the control panel from burning out soap146 The back of the MM stamper feeding soap to the GD Wrapping machine soap147 "The original Compton Building under construction, completed 22nd May 1964" soap148 Interior of the unfinished Compton building soap149 The finishing touches being put to the Compton building

AYZMU:P15-0080 image 20 of 23
1960 - 1969
Standard Soap -factory interior and exterior views. Mostly the 1960's. soap127 Glycerin building and the reservoirs of the old waterworks (almost identical to soap05 but more blurred) soap128 Large building housing the flake mill. Small building in front is the perfume store soap129 Fat Plant inside the vaulted roof building shown in soap 13 soap130 Ladies' locker room before 1962. It later became the factory shop soap131 "Car park in the 1980s with ""Castle Works"" wrought iron gate to right" soap132 Same mill room as in soap08 but post 1964 when the production lines were turned round soap133 New MM automatic stamper line 5. This room was next to the one in soap132 soap134 Line 5 again (as in soap133) with an experimental base feeder going up to the mixer soap135 Four story factory and part of Glycerin building in about 1963 soap136 The old fitting shop soap137 The old fitting shop with a view through the window to the new mill room completed in about 1964 soap138 Fitting shop stores and offices soap139 "The White House, used as an office block. To the right can be seen the MD's garage and to the left the new mill room. Date, after 1964" soap140 The White House office block with Compton Building behind soap141 Number 7 plodder and cutter in operation soap142 The MM Stamper soap143 Production line with perspex cover leading to GD Wrapping Machine soap144 The control panel for the plodder soap145 Cooling fan to stop the diodes in the control panel from burning out soap146 The back of the MM stamper feeding soap to the GD Wrapping machine soap147 "The original Compton Building under construction, completed 22nd May 1964" soap148 Interior of the unfinished Compton building soap149 The finishing touches being put to the Compton building

AYZMU:P15-0080 image 21 of 23
1960 - 1969
Standard Soap -factory interior and exterior views. Mostly the 1960's. soap127 Glycerin building and the reservoirs of the old waterworks (almost identical to soap05 but more blurred) soap128 Large building housing the flake mill. Small building in front is the perfume store soap129 Fat Plant inside the vaulted roof building shown in soap 13 soap130 Ladies' locker room before 1962. It later became the factory shop soap131 "Car park in the 1980s with ""Castle Works"" wrought iron gate to right" soap132 Same mill room as in soap08 but post 1964 when the production lines were turned round soap133 New MM automatic stamper line 5. This room was next to the one in soap132 soap134 Line 5 again (as in soap133) with an experimental base feeder going up to the mixer soap135 Four story factory and part of Glycerin building in about 1963 soap136 The old fitting shop soap137 The old fitting shop with a view through the window to the new mill room completed in about 1964 soap138 Fitting shop stores and offices soap139 "The White House, used as an office block. To the right can be seen the MD's garage and to the left the new mill room. Date, after 1964" soap140 The White House office block with Compton Building behind soap141 Number 7 plodder and cutter in operation soap142 The MM Stamper soap143 Production line with perspex cover leading to GD Wrapping Machine soap144 The control panel for the plodder soap145 Cooling fan to stop the diodes in the control panel from burning out soap146 The back of the MM stamper feeding soap to the GD Wrapping machine soap147 "The original Compton Building under construction, completed 22nd May 1964" soap148 Interior of the unfinished Compton building soap149 The finishing touches being put to the Compton building

AYZMU:P15-0080 image 22 of 23
1960 - 1969
Standard Soap -factory interior and exterior views. Mostly the 1960's. soap127 Glycerin building and the reservoirs of the old waterworks (almost identical to soap05 but more blurred) soap128 Large building housing the flake mill. Small building in front is the perfume store soap129 Fat Plant inside the vaulted roof building shown in soap 13 soap130 Ladies' locker room before 1962. It later became the factory shop soap131 "Car park in the 1980s with ""Castle Works"" wrought iron gate to right" soap132 Same mill room as in soap08 but post 1964 when the production lines were turned round soap133 New MM automatic stamper line 5. This room was next to the one in soap132 soap134 Line 5 again (as in soap133) with an experimental base feeder going up to the mixer soap135 Four story factory and part of Glycerin building in about 1963 soap136 The old fitting shop soap137 The old fitting shop with a view through the window to the new mill room completed in about 1964 soap138 Fitting shop stores and offices soap139 "The White House, used as an office block. To the right can be seen the MD's garage and to the left the new mill room. Date, after 1964" soap140 The White House office block with Compton Building behind soap141 Number 7 plodder and cutter in operation soap142 The MM Stamper soap143 Production line with perspex cover leading to GD Wrapping Machine soap144 The control panel for the plodder soap145 Cooling fan to stop the diodes in the control panel from burning out soap146 The back of the MM stamper feeding soap to the GD Wrapping machine soap147 "The original Compton Building under construction, completed 22nd May 1964" soap148 Interior of the unfinished Compton building soap149 The finishing touches being put to the Compton building

AYZMU:P15-0080 image 23 of 23
1960 - 1969
Standard Soap -factory interior and exterior views. Mostly the 1960's. soap127 Glycerin building and the reservoirs of the old waterworks (almost identical to soap05 but more blurred) soap128 Large building housing the flake mill. Small building in front is the perfume store soap129 Fat Plant inside the vaulted roof building shown in soap 13 soap130 Ladies' locker room before 1962. It later became the factory shop soap131 "Car park in the 1980s with ""Castle Works"" wrought iron gate to right" soap132 Same mill room as in soap08 but post 1964 when the production lines were turned round soap133 New MM automatic stamper line 5. This room was next to the one in soap132 soap134 Line 5 again (as in soap133) with an experimental base feeder going up to the mixer soap135 Four story factory and part of Glycerin building in about 1963 soap136 The old fitting shop soap137 The old fitting shop with a view through the window to the new mill room completed in about 1964 soap138 Fitting shop stores and offices soap139 "The White House, used as an office block. To the right can be seen the MD's garage and to the left the new mill room. Date, after 1964" soap140 The White House office block with Compton Building behind soap141 Number 7 plodder and cutter in operation soap142 The MM Stamper soap143 Production line with perspex cover leading to GD Wrapping Machine soap144 The control panel for the plodder soap145 Cooling fan to stop the diodes in the control panel from burning out soap146 The back of the MM stamper feeding soap to the GD Wrapping machine soap147 "The original Compton Building under construction, completed 22nd May 1964" soap148 Interior of the unfinished Compton building soap149 The finishing touches being put to the Compton building

AYZMU:P15-0079 image 1 of 13
1960 - 1969
Standard Soap -factory interior views. probably the 1960's. soap114 Production line from plodder to wrapper soap115 "Production line from ploddder, cutter, control panel, perspex covered conveyors and stamper" soap116 Mill and conveyor to vacuum plodder soap117 "soap base hopper, elevator and mixer" soap118 "soap base hopper, elevator and mixer" soap119 soap base store soap120 soap stamping machine? soap121 soap stamping machine? soap122 machine type unknown soap123 machine type unknown soap124 machine type unknown soap125 conveyor for lifting soap base to plodder soap126 "Large skip, type and purpose not known"